Timeline — development record
From framework to fieldwork
Milestones supported by the record. A specification, an artifact, and a validated result each have a different status; the tag says which.
2019–2025
Research
Ethnographic fieldwork on the Buildspace community across online platforms and physical gatherings. Qualifying exams passed September 2022; Ph.D. awarded 2025.
2021–2023
Published
Media-systems analyses, an open-resources curation method, and three years as sponsor project lead of the University of Utah's Bridge Language Program data-visualization partnership with MSIS capstone teams.
July 15, 2023
Journal
The first thing the author asked this assistant was about the Lindy effect: how to tell what lasts.
Aug 2023 – Jul 2024
Fieldwork
Participant observation online and at Fort Mason, San Francisco; the author built in House Erevald.
August 23, 2024
Record
The program studied in the dissertation announces its closure two weeks after its largest in-person event.
October 19, 2024
Journal
Twenty-two songs written and vibe-tracked by the author, produced with Suno, released as Mameen. The Buildspace season project, shipped after the program closed.
Late 2024
Founded
Established as the research and publication arm of Pip Projects, Inc.
March 2025
Milestone
The committee names the Digital Sidewalk a new measurable framework and asks for one revision: claim it plainly.
April 2025
Decision
Digital Sidewalk chosen for the public research entity; Gravel9 set aside as the applied engine. First public site built.
2025
Published
The Digital Sidewalk: Indirect Learning and Entertainment-Education in Decentralized Communities, IEEE Digital Education and MOOCs Conference.
January 6, 2026
Design record
One bounded-cavity model for acoustic, thermal, and HVAC domains. Validation checklist written, not run.
January 2026
Built
Four-surface console deployed; two-device differential rig running in Clemson.
January 24–25, 2026
Dataset
23,451 samples over 17.5 hours through a real ice storm, published with stated limits.
2026
Published
A computational lower bound for f(3), and a paper on Titze's vocal-acoustics framework as an archetype of resonant systems.
August 6, 2026
Archive
Observation schema, evidence classes, missingness taxonomy, source registry, validation plan.
August 11, 2026
Validated
Frozen failure preserved; ceiling meta-calibrated from 200 null replicates; independent reproduction; shelved pending real use.
August 15, 2026
Framework
Four levels of claim, four ledgers, nodes and export profiles. Global protocol v0.2 written the same day.
August 20–21, 2026
Method
Long-term harness specified and built with an honest real/stub list; blind microphone calibration protocol written.
September 12, 2026
Release candidate
Apache-2.0 platform with a pluggable detection interface; the Lab's engine sits outside as a provider.
September 13, 2026
Governance
Unit 01 named; three uses of one name separated by rule.